bwin必赢唯一(中国)官方网站-ios/安卓App Store

 中文 / EN
CURRENT > HOME > BNWAS Installation Schedule

BNWAS Installation Schedule

NEWSTIME: 2020-09-27

BNWAS Installation Schedule for International Navigation Ships

Ships Category

Specifications (GT)

Installation Deadline

New shipbuildings

on and after July 1, 2011

All passenger ships

The time of shipbuilding

Ships of 150 GT and above

Ships built before July 1, 2011

All passenger ships

No later than the annual inspection

for the first time after 1 July 1, 2012

Ships of 3000 GT and above

Ships of 500 GT and upwards to 3000 GT

No later than the annual inspection

for the first time after 1 July 1, 2013

Ships of 150 GT and upwards to 500 GT

No later than the annual inspection

for the first time after 1 July 1, 2014


Copyright (©) 2020 NEW SUNRISE CO., LTD.  ICP 2020050227  Technical Support: suzhou yuanma   Su Gong An Bei No.32050702010919